Kings College Hospital Outpatients
KEY FACTS
Customer: Premier Modular Limited / Kings College Hospital NHS Trust
Value: £24m
Start date: August 2021
Completion date: Spring 2022
Overview: New four storey modular outpatient building in the heart of the fully operational hospital site
This project was delivered for Premier Modular Limited as main contractor with Claritas on site as principle contractor. The JCT design and build scheme provides a new four-storey modular outpatient building at King’s College Hospital.
The new building is situated next to the existing live and fully operational Normanby Building on the Denmark Hill site with a new link connecting the two buildings. This project is part of the wider masterplan of the hospital to modernise the buildings, and is a vital component helping free up space within the main hospital.
The scheme was designed to minimise impact on the environment with a BREEAM excellent target rating. In addition to the environmental benefits of offsite manufacturing, the scheme will have a green roof, a Premier Modular manufactured highly insulated building fabric, electric air source heat pump system and solar panels.
Working as strategic delivery partner with Premier Modular, our Principle Contractor duties include groundworks, piling, façade, elements of roof and providing the link building.