Follow the link below to view the latest edition of Volumetric Modular magazine. Page 36 features the delivery of the 62 bed priority assessment unit at St Peter’s Hospital, Chertsey. The article written by our innovation partner, PremierModular describ es the benefits of the volumetric solution in order to meet the Trust’s urgent need for extra capacity during the winter months.
Claritas supported Premier Modular as delivery partner, overseeing the site preparation and installation of the building modules.
The offsite solution was engineered to fit seamlessly into the existing and fully operational hospital, maintaining flows between the existing facilities and the new unit.
The scheme was designed by BDP with P+HS as delivery architects.